Utility tunnel (new administrative capital)

Utility tunnel (new administrative capital)

Overview

Excavation, structure, MEP, and finishing works for concrete box culvert to carry electric cables, length 20 km and average cross section (5.0 × 6.5 m).
Utility Tunnel Project
📍 Location: New Administrative Capital, Egypt
📅 Duration: 2016 - 2018
👷‍♂️ Client: New Urban Communities Authority (NUCA)
💵 Contract Value: 63.5 Million USD

Key Features

  • Excavation for 20 km underground tunnel
  • Structure works for concrete box culvert
  • MEP systems installation across full tunnel length
  • Finishing works for cable-carrying infrastructure
  • Average cross section: 5.0 × 6.5 meters
  • Supports high voltage electric cables for city infrastructure