A cutting-edge facility built to serve the East Port Said Industrial Zone, this plant ensures
effective treatment of industrial wastewater while upholding environmental standards. With
advanced modular design and phased development, it promotes eco-friendly industrial expansion
and sustainable water management in one of Egypt’s most vital economic zones.
– Location: East Port Said, Egypt
– Duration: 2024-2026
– Client: Engineering Authority of the Egyptian Armed Forces
– Contract Value: $66,860,000
– Total Capacity: 200,000 m³/day
– Phased Development: Eight phases of 25,000 m³/day each
Key Features:
Advanced Wastewater Treatment System for Maximum Efficiency:
• Sedimentation tanks eliminate large suspended waste particles.
• Balancing tanks regulate fluctuating wastewater volumes.
• DAF units remove oils, grease, and fine solids.
• Aeration and selector tanks drive biological purification.
• Chlorination units disinfect treated water for reuse.
• Sludge thickening and dewatering units reduce waste.
Sustainable Industrial & Environmental Impact:
• Delivers treated water that meets strict eco standards.
• Enables water reuse and reduces industrial discharge.
• Supports clean growth in Egypt’s industrial sectors.