New Administrative Capital Infrastructure Projects
Overview
Transmission Line of Raw Water from the Nile
• Execution of Pump Station No.3 with a total capacity of 800,000 m³/day on a total Built-up area of 1,500 m²
• Three Transmission Water Lines, DN 2200mm with a total length of 51 Km from Pump Station No.2 to Pump Station No.4 with a total capacity of 1.5 million m³/day.
Eastern Regional Road Infrastructure:
• Water, Sewage, and Irrigation facilities for the extension of North & South of Bin Zayed Road.
• 5 Irrigation Tanks with total capacity of 100,000 m³.
• Execution of Pump Station No.3 with a total capacity of 800,000 m³/day on a total Built-up area of 1,500 m²
• Three Transmission Water Lines, DN 2200mm with a total length of 51 Km from Pump Station No.2 to Pump Station No.4 with a total capacity of 1.5 million m³/day.
Eastern Regional Road Infrastructure:
• Water, Sewage, and Irrigation facilities for the extension of North & South of Bin Zayed Road.
• 5 Irrigation Tanks with total capacity of 100,000 m³.

📍 Location:
New Administrative Capital, Egypt
📅 Duration:
2016 - 2024
👷♂️ Client:
New Urban Communities Authority (NUCA)
💵 Contract Value:
270 Million USD
Key Features
- Pump Station Capacity: 800,000 m³/day (Station No.3)
- Water Lines: DN 2200mm, 51 km total length
- Total Transmission Capacity: 1.5 million m³/day
- Irrigation Tanks: 5 tanks, 100,000 m³ total capacity
- Infrastructure Scope: Water, Sewage, and Irrigation for Bin Zayed Road extensions