A vital component of the wastewater network in 6th of October City, this infrastructure project
ensures the reliable collection and transfer of wastewater to treatment facilities. With a
high-capacity design and advanced monitoring systems, the lift station supports sanitation, public
health, and environmentally sustainable urban growth.

– Location: 6th of October City, Egypt
– Duration: 2016-2018
– Client: Engineering Authority of the Egyptian Armed Forces)
– Contract Value: $66 Million
– Capacity: 1,500 liters per second
– Function: Wastewater pumping and transportation

Key Features:
High-Efficiency Pumping & Control Systems:
• Submersible pumps with redundancy for safe operation.
• SCADA platform enables live tracking and response.
Advanced Wastewater Transfer & Infrastructure:
• Pipelines use corrosion-resistant, high-flow materials.
• Connects sewage to treatment hubs and mains.
Urban & Environmental Benefits:
• Boosts wastewater handling in expanding districts.
• Prevents sewage overflow and environmental damage.
• Enables urban and industrial sustainable growth.